Following that, the tremie gets a gradual addition of concrete. After the tremie is stuffed, it really is elevated by a little or no total, which makes it possible for the concrete to stream out in the opening. An inadequate bearing ability of the soil to bear a framework https://trentoncmwgq.blogkoo.com/foundation-pile-testing-bd-for-dummies-49629781