The main park incorporates a potential of two hundred MW though Sandrini II has a capability of a hundred MW. The full cost of both equally jobs weren't disclosed nevertheless, through development, around two hundred staff were being utilized. The assignments are anticipated to find out a handful of positions https://californiasolarpanelinstallation.tech.blog/2024/11/26/4-things-to-consider-before-hiring-commercial-solar-installers/