At first, the Jai Hind metro station was prepared for being elevated. Nonetheless, the AAI objected that the elevated stretch up towards the airport might pose a threat to aircraft, And so the route was more reworked and the station was shifted underground, 150 m with the Airport terminal building. https://railway-kolkata19631.goabroadblog.com/31341506/railway-recruitment-kolkata-rrb-group-d-32000-vacancy-pdf