Engaged on TRS sheds linked to overhauling and assembly amount servicing of 25KV AC electrical locos in electrical loco sheds is the worker’s duty. In 2008, the Kolkata Metro Railway experimented with the exercise of reserving two entire compartments for Ladies. This system was identified for being ineffective and induced https://railway-group-d-jobs89000.pointblog.net/railway-recruitment-kolkata-rrb-group-d-32000-vacancy-pdf-74798355