An electrical utility shall make net energy metering accessible to suitable shopper-generators on a primary-occur, to start with-served basis until eventually the sooner of both: (i) June thirty, 2029; or (ii) the initial date on which the cumulative creating potential of net metering systems equals 4 p.c from the utility's https://swiss-directory.com/listings1018211/detailed-notes-on-solar-panel-rebate-wa